P.U.(A)
5/70
FACTORIES
AND MACHINERY (STEAM BOILER AND
UNFIRED PRESSURE VESSEL)
REGULATIONS, 1970
PART IV -
MISCELLANEOUS PROVISIONS
Regulation
84. Fees.
(1) Fees shall be charged
as follows:
(1) Fees shall be charged
as follows:
(i) For approval of design
and assigning
an authorised safe working
pressure in
respect of any steam
boiler to be
manufactured in the
Federation ... ... ... $100
(ii) For approval of the
design and
assigning an authorised
safe working
pressure in respect of any
unfired
pressure vessel to be
manufactured in
the Federation ... ... ... 50
(iii) For every visit of
survey made
during construction on any
steam boiler
or unfired pressure vessel
manufactured
in the Federation ... ...
... ... ... 25
(iv) For assigning an
authorised safe
working pressure on any
imported $100
steam boiler which-
(a) complies
with standard
conditions as prescribed
under 150
regulation 7 (2) ...
(b) which
does not comply with
standard conditions
prescribed
(v) For assigning an
authorised safe half the fee
working pressure to any
imported prescribed in
unfired pressure vessel respect
of a
steam
boiler
under sub-
paragraph
(iv) of this
Paragraph
(vi) for conducting an
hydrostatic test
On
. $25
(a) a steam
boiler having a
heating surface less than 250 50
sq. ft. ... ...
(b) a steam
boiler having a
heating surface of or
exceeding 15
250 sq. ft. ...
(c) an
unfired pressure vessel
having a cubic capacity of or [Ins. P.U.(A) 375/71]