SALAM SEJAHTERA

SALAM SEJAHTERA,SELAMAT DATANG KE HAMDISAAD74.BLOGSPOT

Saturday, 23 March 2013

FIFTH SCHEDULE



                                     P.U.(A) 5/70
FACTORIES AND MACHINERY (STEAM BOILER AND          
                    UNFIRED PRESSURE VESSEL)
                             REGULATIONS, 1970

FIFTH SCHEDULE

                     GOVERNMENT OF MALAYSIA

           FACTORIES AND MACHINERY ACT, 1967


FACTORIES AND MACHINERY (STEAM BOILER AND  
                 UNFIRED PRESSURE VESSEL),
                            REGULATIONS, 1970

                                 Regulation 7 (3)

CERTIFICATE OF INSPECTING AUTHORITY


I, ..............................................being a Member / Surveyor of ......................................................an
Inspecting Authority named in the Fourth Schedule to the Factories and Machinery (Steam Boiler
and Unfired Pressure Vessel), Regulations, 1970, Malaysia, hereby certify that Steam Boiler /
Unfired Pressure Vessel Serial No. ................................................was constructed by Messrs
........................................................ for ......................................................in accordance with their
drawing number ................................................

It was surveyed during construction by me and the scantlings are in accordance with
................................................. (being a code name in the Second / Third Schedule to the
aforementioned Regulations) for a design pressure of .............................. pounds per square
inch. The workmanship is good.

Samples of all materials used in its construction were tested by, or in the presence of, Inspectors
of this Company and found to comply with the provisions of the above-mentioned Code.

On completion the Steam Boiler / Unfired Pressure Vessel was tested hydrostatically
to........................................................... pounds per square inch for a period of
............................................. minutes in my presence on .................................................... It
Showed no signs of weakness and was found tight and sound in every respect at that pressure. It
was stamped by me as follows:

.......................................................................
.......................................................................


Dated this ..........................................................day of ............................. 19 ......................
(Signed) .............................................
Member / Surveyor
.......................................................
Chief Engineer to Inspecting Authority



Copyright © 2004 PNMB-LawNet. All rights reserved.


No comments:

Post a Comment

Saya amat berterima kasih sekiranya anda dapat memberi komen yang baik tentang blog ini.

Note: only a member of this blog may post a comment.